The City is finalizing the design for Phase 2 of the US 6 project. Utilizing traffic data, a computerized model was established to simulate traffic flow with the proposed modification at Center St. and US 6. There are two simulations: AM peak traffic and PM peak traffic.

AM Peak: https://youtu.be/76anPX_hcYQ

PM Peak: https://youtu.be/vbve5v4MUAA

The City will be hosting a public information event this spring. Once a date is finalized, we will publicize on all of our outreach channels.

The traffic light at Center St. and US 6 is no longer warranted via ODOT’s traffic regulations, and therefore, will be removed. A rendering of the design can be found on the City’s website here.